Projects
Interstate 155/74 project in Morton, IL
Miller & Son Construction Co. excavated approximately 400,000 cubic yards of dirt to allow for 2 new bridges to be constructed and the interchange to be reconfigured.

U.S. Army Corps of Engineers
Spring Lake Levee Rehabilitation - Miller & Son Construction Co. regraded approximately 1500 feet of river side slope on the Illinois River Levee. Then we placed approximately 10,000 tons of rock on the river side slope to stop the levee from eroding away.

Lancaster Road Bridge
Miller & Son Construction Co. moved approximately 250,000 cubic yards of dirt to realign approximately 1 1/2 miles of roadway to allow for a new 3 span bridge to be built across Kickapoo Creek.